12. November 2026
Replacing a CNC spindle unit
A completed CNC service job involved replacing the spindle unit. SEKELA CZ coordinates service requests with RH Machine...
Replacing a CNC spindle unitWe are engineers, innovators and a team that loves its work.
We design production lines and fixtures, machine and weld parts to drawings, and relocate machines and entire production technologies.
We design production lines, robotic workstations, and assembly and inspection fixtures.
We relocate machines and entire lines, from dismantling to positioning and commissioning.
We mill and turn parts to drawings, from one-off pieces to repeat batches.
We produce laser-cut parts, bent parts and welded structures.
Precise workmanship is a matter of course for us.
Time is crucial, so we always make sure agreed deadlines are met.
If you are not satisfied, we will review the work and find a solution.
A compact fixture guides the operator when fitting the wires and helps prevent mixing up their colour sequence.
The cooling paternoster keeps pace with the injection moulding machine cycle and stores parts during cooling in a limited space.
The plasma cell with two robots combines the mechanical structure, the electrical part and control of the production operation.
SEKELA CZ has a quality management system certified by TÜV SÜD Czech according to ČSN EN ISO 9001:2016.
Certificate No. 17.997.133. Certification cycle valid: 26. 6. 2025 - 25. 6. 2028.
Machines, service, electrical installations and control cabinets. Get to know our partner companies.
Machine tool service and maintenance
RH Machine Care services, maintains and relocates machine tools.
Electrical installations and inspections
Elektro Hán carries out electrical installations, inspections and industrial relocations.
Electrical design and control cabinets
SMID CZ designs electrical systems and manufactures control cabinets.
12. November 2026
A completed CNC service job involved replacing the spindle unit. SEKELA CZ coordinates service requests with RH Machine...
Replacing a CNC spindle unit
12. November 2026
The operator loads the bumper into a fixture. The positioner rotates the part. A FANUC LR Mate 200iD travels along a lin...
ScanMach: how a robot measures a bumper in 3D
12. November 2026
Two deliveries of the same part illustrate repeat production. The technical specification and the required batch sizes a...
Repeat deliveries of metal parts
We work in a friendly spirit and are not afraid to do things a little differently.
Friendship plays an important role for us - many of our suppliers have also become our friends. We often spend time together outside work too, for example at team-building events or joint activities.
The aim of the project was to optimise the production premises, their spatial layout and material flow in order to maximise operational efficiency. The result was a spatial layout design presented in 2D and 3D models using virtual reality.
