Technology with the soul of craftsmanship

We automate, machine, manufacture.

We are technicians, innovators, and a team that loves its work.

Intro graphic hexagons


Our Services

Automatization

Automatization

We often design complex solutions to simplify your manufacturing process and make it much more efficient, in terms of time, resources, and management.

Technology relocation

Technology relocation

Metalworking

Metalworking

Electrical panel manufacturing

Electrical panel manufacturing

Research and Development

Research and Development


Our key advantages

Quality at the highest level

High-quality craftsmanship is standard with us.

Express processing

Time is crucial, which is why we always ensure deadlines are met.

Satisfaction guarantee

If you are not satisfied, we will review the situation and find a solution.


Our Partners

WITTE Automotive
BORGERS
Continental
Eissmann Group Automotive
Hutchinson
DAIKIN
EuWe
Shape Corp.
Lear
Christ Wash Systems
POLYTEC GROUP
Vitesco Technologies
Integrated Micro-Electronics
Pfeifer
Lukov
FHS Equipment
Strunk Connect
Mubea
Automa CZ
Autoneum
Saint-Gobain
Siemens
Strabag
Valeo
Wabtec
Mondeco
Intelexon
SMC
ABB
Blaser Swisslube
Bosch
Fanuc
Festo
Güdel
Haas Automation
HIWIN
Keyence
SICK
Turck


Case Studies

Případová studie - Test

Případová studie - Test


Projects

Continental

Continental

We began a large-scale project under our partner company, Strunk Conect Czech, installing a Chinese production line from the company FHS.

It arrived by train in 10 shipping containers.

On the production lin

Cooling rack

Cooling rack

Cooling rack for Porsche parts.

The parts had to cool for a specified period to prevent warping during further processing (lamination).

The time when a part could be removed was indicated automatically by colored signals.

Dvořák Cell

Dvořák Cell

Two-Robot Welding Station

The welding station is equipped with two Fanuc robots mounted on a shared 7th axis. The robots are fitted with welding units supplied by the customer.

In principle, parts are loaded on one side while welding takes place on the other side of the station.

At the front,

Clamping jig

Clamping jig

Clamping jig

Inspection jigs

Inspection jigs

Assembly and Inspection Jig (Poka-Yoke) for Fitting Locking Elements, Subsequent Overall Inspection of Each, and Marking Good Parts with a Pin in Case of Correct Assembly.

If a locking element was missing, the part was not released, and the position of the missing component was displayed on the operator pane

Inspection jig for connectors

Inspection jig for connectors

A small, compact, and portable device for the correct assembly of M12 industrial connectors.

Our device prevents the wires from being inserted in the wrong color order during connector assembly.

After placing an empty connector, its presence is confirmed, which starts the cycle.

Once the cycl

Laser engraving

Laser engraving

Machine for Laser Engraving DMC Codes on Paper Medicine Boxes

After placing five boxes into the feeder, the magazine moves into the machine, where the laser head engraves the DMC code at the specified location.

The machine was, of course, equipped with an exhaust system.

After engraving, all

Paternoster – Cooling Rack

Paternoster – Cooling Rack

Due to the cycle time of the injection molding machine, it was necessary to design this cooling rack for parts removed from it.

Our equipment is designed with space efficiency in mind.

The capacity was for 12 large parts.

L-shape Jig

L-shape Jig

L-shape Jig

Plasma Cell

Plasma Cell

Two-Robot Cell for Plasma Cutting of Bumper Reinforcements

Complete in-house production from design to installation, covering both the mechanical and electrical parts.

The implementation period from design to handover is approximately 6 months.

The equipment is fitted with two Fanuc robots an

Assembly and Inspection Jig for QR Code Application

Assembly and Inspection Jig for QR Code Application

Assembly and Inspection Jig for QR Code Application

Lifting Table – First Contract

Lifting Table – First Contract

Lifting Table – First Contract

Heat-Shrink Oven

Heat-Shrink Oven

Heat-Shrink Oven

Homepage – Modern Facilities

Homepage – Modern Facilities

Homepage – Modern Facilities


Our goal is your satisfaction

We work in a friendly spirit and are not afraid to do things a little differently.

Friendship plays an important role for us – many of our suppliers have become our friends. We often spend time together outside of work, for example at teambuilding events or shared activities.


What they say about us

NZ

Naši zaměstnanci

20. February 2018

Star Star Star Star Star

Strašně nás baví když je to občas trochu punk =)

Z

Zákazník

20. November 2024

Star Star Star Star Star

Sekela stěhuje stroje tak rychle, že Google nestíhá aktualizovat mapy.

ZO

Zákazník z Prahy co potřeboval urgentní CNC obrobky

11. August 2022

Star Star Star Star Star

Kdyby všichni fungovali jako Vy, tak jsme dávno před Amerikou

NZ

Náš zaměstnanec

15. January 2018

Star Star Star Star Star

Mám pocit, že chodím dělat něco s partou kamarádů u čeho se vždy zasmějeme a je to vždy super parta lidí

ZA

Zaměstnanec firmy Automa

6. September 2019

Star Star Star Star Star

Tak my tady jíme dřevěnejma lžícema a Sekeláči jezdí v amerikách

PC

Projektový vedoucí z Continentalu

10. March 2021

Star Star Star Star Star

Vy jste ale hrozná sebranka =)

ZS

Zaměstnanec firmy Shape

24. August 2022

Star Star Star Star Star

Kam čert nechce, nastoupí Sekela

PS

Projektový manager z firmy Shape

24. August 2022

Star Star Star Star Star

Zlatý Sekeláči, po těch se nic konktrolovat nemusí

MF

Majitel firmy FPC

20. April 2023

Star Star Star Star Star

Když jsem viděl jaký máte rozsah, tak sem nevěřil, že to jde uřídit....ale dokázali jste mi, že to je možné


Modern
and well-equipped facilities


Interested in our services?
Write to us!


Project

Optimization of current production areas in 2D and 3D visualization

is co-financed by the European Union.

The aim of the project was to optimize production spaces, layout, and material flow to maximize operational efficiency. The outcome was a layout design presented in 2D and 3D models using virtual reality.