Total 3 pages
For the Světovar multi-storey car park in Pilsen, we provided custom metal fabrication, supply and installation of the expanded metal facade and related metalwork.
The scope included the frame structure of the ventilated facade, railings and handrails, partitions, sectional doors and stainless steel lettering. See what the preparation looked like in the 3D model and how the elements look on site.
Browse assembly and inspection fixtures, robotic cells and equipment for handling, cooling and marking. The project details show their purpose and the solution used.
These project pages are in preparation. The cheese-handling equipment is shown in photographs, and the other projects include illustrative diagrams where applicable. The technical descriptions and results are being reviewed.
Four manipulators for cheese packaging. Photos of the actual equipment and details of its design.
Contact us directly
+420 778 080 606 sekela@sekela.cz
Continue via the enquiry form
Describe what you need. You can attach supporting documents.