PLC programming and machine control modifications

PLC programming tailored to your processes

We program PLCs and HMI controls for new machines and modifications of existing lines. For an assessment, send us the PLC and panel type, a description of the required function or fault, and whether you have the project or a program backup. For a line in operation, state the possible shutdown window.

PLC programming and machine control modifications

What should the machine do differently?

We prepare PLC and HMI modifications for existing machines according to the specific change in the production process. In the brief, state the type of control system, the availability of the source project or backup, and the planned shutdown. Together we define the functions to be modified, the interfaces with electrical and mechanical parts, and the verification method after start-up.

For a new control system, describe the required work sequence. For a change to an existing program, compare the current behaviour with the target state and mark the functions that must not change.

The requirement may be a different sequence of operations, a modification of the controls or signal transfer to another device. We assess the exact scope based on the system, the available documents and the operating conditions.

Back to the industrial automation overview

PLC programming, HMI controls and machine integration

PLC modernisation of existing machines

If you need to change a machine's control system, we first assess the available program, backup, control panel and connections to surrounding equipment. Based on the brief, we propose which functions to modify and how to verify them.

During the installation of the FHS line, our work included control cabinet modifications, HMI translations and support during the production ramp-up.

Installation and commissioning of the FHS production line

Project example: modification of a Siemens PLC program and control panel

Work sequence

Work sequence

The order of steps, the conditions for starting and completing an operation, and cycle interruption. The brief links the required function to the machine's sensors and drives.

Controls and messages

Controls and messages

HMI screens, i.e. the control panel, settings and information for the operator. We also clarify the required procedure in the event of a fault or work interruption.

Interfaces with surrounding equipment

Interfaces with surrounding equipment

Exchange of signals and states with other parts of the workstation. When modifying a program, we define the new interfaces as well as the functions that must be retained.

Control in specific applications

Laser marking and DMC code inspection

Laser marking and DMC code inspection

After the boxes are loaded, laser marking takes place, followed by reading of the DMC codes. Our own program checks their content. The detail shows how the work cycle is linked with result verification.

Installation and commissioning of the FHS production line

Installation and commissioning of the FHS production line

On a production line for a customer from the automotive industry, we worked under a partner company on commissioning processes, translating control panels and modifying equipment. This was part of the line delivery by the manufacturer FHS.

Documents for assessing a control change

A PLC programming request needs to describe both the specific function and the environment in which the change is to work.

Control system and available project

Control system and available project

State the exact PLC type, system generation, development environment and control panel. Describe the availability of the current project, backups, electrical documentation and authorised access. It is also important whether the documents correspond to the current state of the machine.

Signals and connected machines

Signals and connected machines

Identify the devices that exchange data and describe the meaning of the signals. For each new interface, state what starts the operation, what confirms its completion and which condition the next machine must wait for.

Controls and fault sequence

Controls and fault sequence

Describe the automatic and manual procedure, the panel messages and the required continuation after an interruption. For an intermittent problem, the circumstances of its occurrence, the specific product variant and the last step the machine completed are helpful.

From function description to program deployment

Clarifying the required change

We compare the current behaviour with the required state. For a new control system, we compile a cycle description; for a change, we identify the functions that must be retained.

Design of the intervention and tests

We agree on the required access, the scope of backups, the shutdown conditions and the verification method. We also clarify how operation will be restored if an obstacle arises during deployment.

Programming and commissioning

We prepare the agreed functions and, during deployment, verify how they work with the actual signals and equipment. The test conditions must correspond to the given machine.

Handover of the change

To the agreed extent, we go through the controls, the modified functions and the project documents. The agreement also covers the required follow-up support.

Verification also covers cycle interruption and resumption

We determine the scope of tests according to the intervention in the control system and the requirements of the specific equipment.

Work sequence

Work sequence

Demonstration of the agreed functions and variants, including interfaces with drives, sensors and connected machines.

Controls and non-standard states

Controls and non-standard states

Verification of the agreed messages, responses to a missing condition and the operator procedure when an operation is interrupted or resumed.

Version handed over

Version handed over

A pre-agreed scope of the project, backups and change description, so that it is clear which version corresponds to the state handed over.

What a test of the modified program should prove

Successfully completing one cycle is not a full description of the expected result.

Example brief: after an operation is interrupted, the operator should be able to see why the machine stopped and what the agreed procedure for continuing is. When preparing the change, therefore also describe the messages, missing conditions and interfaces with surrounding equipment.

We determine the scope of tests for the specific machine. At handover, we also define the project version, backups and change description, so that it is clear which documents correspond to the modified control system.

Questions about intervening in a machine's control system

Can an existing PLC program be modified?

The assessment depends on the type of control system, the availability of the project or backup, and the required change.

Is the PLC brand enough for an enquiry?

If possible, add the exact CPU type, the development environment and its version, the control panel and the communications used. A single brand covers different generations of systems.

What if we do not have the source project?

State what is available: a backup, electrical documentation, a cycle description and access credentials. Missing documents may limit whether an intervention is possible or its scope; the specific system needs to be assessed first.

Will you modify the program of equipment from another supplier?

We assess whether a modification is possible based on the system, the availability of the project, documentation and access rights. In your enquiry, name the original supplier and the required change.

How do we prepare an intervention during a limited shutdown?

State the available time windows and the dependencies on other machines. Before the intervention, the scope of the change, the tests and the conditions for restarting production need to be agreed.

Will we receive the program project and training?

Before implementation, we agree on the scope of projects, backups, change description and training to be handed over. We take into account the documents and licences of other suppliers.

What should the control panel show when an assembly error occurs?

Specify which error the operator should recognise and how they will correct it. In our inspection fixture project, the panel shows the position of the missing locking element, the part remains clamped and the inspection is repeated after correction. This example will help you describe the required response of your workstation.

How do we describe a problem that does not occur in every cycle?

Record when it occurred and with which product variant, what preceded it and which message the panel displayed. State how often it occurs and any connection with a changeover or a new program version. Photos of the message or a short recording of a normal cycle will complement the description; the error text alone may not explain the cause.

Which control systems can be included in a PLC programming enquiry?

Our PLC programming services cover Siemens, Allen-Bradley, Mitsubishi, Omron, Beckhoff and GE systems. To assess a specific piece of equipment, we need the exact type of control unit, the available project or backup, the required change and the access conditions. We confirm whether intervention is possible and the scope of work based on these documents.

Why choose our PLC programming?

Individual solutions

We tailor the programming to your requirements and operating conditions.

Production optimisation

We ensure maximum efficiency and reliability of your equipment.

Modern technology

We use the latest PLC systems and programming languages (Siemens, Allen-Bradley, Mitsubishi, Omron, Beckhoff, GE).

Seamless integration

Our solutions easily connect your existing systems and equipment.

Support and service

We offer long-term support, code modifications and operator training.

Siemens PLC programming

PLC (Programmable Logic Controller) programming is a key element of industrial automation. It enables efficient real-time control of machines and processes, increasing productivity, reducing error rates and optimising operating costs. Thanks to our individual approach, we can create a solution tailored precisely to your needs.

Projects and technologies we work with

We have experience in a wide range of industries - from manufacturing and logistics to the food industry and energy.

We work with leading PLC manufacturers such as:

  • Siemens (S7-1200, S7-1500, TIA Portal)
  • Allen-Bradley (Rockwell Automation)
  • Mitsubishi, Omron, Beckhoff and GE

We also offer integration with SCADA systems, HMI panels and IoT technologies for remote monitoring and control.

How would you like to contact us?

Contact us directly

+420 778 080 606 sekela@sekela.cz

Continue via the enquiry form

Describe what you need. You can attach supporting documents.