12. November 2026
Repeat deliveries of metal parts
Two deliveries of the same part illustrate repeat production. The technical specification and the required batch sizes are the basis for planning.
12. November 2026
Two deliveries of the same part illustrate repeat production. The technical specification and the required batch sizes are the basis for planning.

The customer needed the same metal part in two separate shipments. SEKELA CZ arranged and completed both deliveries.
Each delivery had its own delivery note. When planning repeat shipments, agree on quantities by date and how parts should be marked and packed.
For a quote, attach a drawing or sample and specify material, quantities and dates. Include any inspection, marking or packaging requirements.