Plasma Cell
Automatization Robot programmingTwo-Robot Cell for Plasma Cutting of Bumper Reinforcements
Complete in-house production from design to installation, covering both the mechanical and electrical parts.
The implementation period from design to handover is approximately 6 months.
The equipment is fitted with two Fanuc robots and high-speed Assa Abloy roll-up doors.